Construction & installation

Built carefully. Documented honestly.

Real projects. Real job sites. A look at CSESCO installations and completed work, captured by our crews in the field.

Below the Surface: Maverik Super Center

Completed field work

Petroleum systems taking shape.

These are company-supplied installation photographs, not stock images. The gallery focuses on distinct views that help explain the scale, routing, and coordination involved in the work.

Aerial view of a multi-tank underground fuel-system installation
Blue fuel-system piping routed beneath a retail fueling canopyAerial overview of canopy construction and underground fuel piping
Underground tanks · canopy piping

Quik Trip installation

A broad fuel-system build documented from the multi-tank excavation through the below-grade piping routed toward the forecourt.

Underground storage tank being lowered into a prepared excavation during a Maverik installation
Underground storage tanks positioned in a lined excavation during a Maverik installationMultiple underground storage tanks arranged in a prepared excavation during a Maverik installation
Underground tank installation

Maverik Installation

Company-supplied photographs show underground storage tanks being lowered and positioned within a prepared, lined excavation.

Fuel-system piping and tank access points across an open construction site
Fuel piping connected to dispenser containment beneath a canopyTank sumps and product piping arranged before backfillColor-coded fuel lines crossing an open petroleum construction site
Tank sumps · dispenser connections

Holiday Oil installation

Below-grade petroleum infrastructure showing tank access points, product lines, dispenser containment, and color-coded piping before backfill.

Group of above-ground fuel storage tanks installed on a prepared site
Above-ground storage

AST installation

A completed group of above-ground storage tanks with connected piping, access hardware, and prepared concrete containment areas.

Blue fuel-system piping installed in a trench beside a fueling canopy
Multiple blue fuel lines routed across a forecourt construction siteFuel lines entering dispenser containment beneath a canopy
Forecourt piping · dispenser containment

Walmart installation

A forecourt installation showing long piping runs, trench routing, and below-grade dispenser connections during construction.

Project & Construction Contacts

Connect with the team that plans, coordinates, and manages CSESCO installation and construction work.

How we approach the work

01

Plan

Confirm scope, equipment, site constraints, responsibilities, and sequence.

02

Coordinate

Align crews, materials, subcontractors, inspections, and operating-site needs.

03

Build

Execute with petroleum-specific attention to code, containment, and safety.

04

Commission

Test, document, start up, and hand off systems ready for continued support.

Ready when you are

Planning a petroleum or DEF project?

Bring CSESCO in early to coordinate equipment, site conditions, installation requirements, and ongoing service needs.